First, according to the construction drawings, weld the skeleton, including the embedded plate, square tube and foot code; Secondly, stone materials shall be cut and ordered according to the framework; Third: After the stone is transported to the construction site, it shall be unloaded by forklift; Fourth: stone installation: prepare stone pendants, marble glue, AB glue, wrench, hand cutter, etc. In order to save pendants, T-shaped pendants are used for the middle stone, the upper and lower sides of the stone are grooved, 4 for one stone, and 6 for two stones (the middle two are shared by T-shaped pendants); Finally, after the stone is hung, apply glass glue (according to the project requirements, decide whether to apply glass glue).